Hello Muthu,
We are trying to distribute central contract from SRM 7.0 to ECC 6.0 to create a contract in ECC with PB00 condition type.
Following config steps are mantained in ECC.
1) Defined SRM condition type 01CT in ECC
2) Mapped SRM condition type and ECC condition type in Assignments of conditions
RM0000 01CT PB00
When distributed contract in SRM a contract in ECC is created but with no item conditions. Though the Inbound IDOC COND_A is processed successfully with 53 status . Pricing procedure RM0000 is picked . After reading other responses, I added 01CT to pricing procedure RM0000 at Step 1 Counter 3 right after PB00 and PBXX. This helped to popup both PB00 and 01CT conditions at item level but system is not able to map/translate 01CT to PB00. Contract in ECC is created with 01CT condition insetad of PB00. Did anyone face this issue. Do we have to go for BADI approach instead of
SPRO.
Please advise!
Thank You,
Saritha