Hello Modak.
This is want happend in event trace. PO was changed on 1/1 and Change event is raised on 18/8
I wanted to know what does this EVENT DATA & TRACEDATA in swel(after double clicking on the event in swel)
Issue is, for a workflow event trace, it says EVENT CREATED ON 1/1/2014 (in event data) and EVENT TRACE DATE/TIME 18/8/2014(trace data).
Here in 1/1/2014 there is an event created CHANGED.but the worklfow did not start then.
It was started on 18/8/2014. By that time the actual release of PO completed and this workflow again started saying PO changed.
If i verify event trace by date for 1/1/14 and 18/8/14 it shows the same
I verified both the CDHDR and CDPOS and see the entries are changed on 1/1/2014 only.
How can this happen???
What does this EVENT TRACE DATE/TIME mean??
The event even created on 1/1/2014 the workflow starts on 18/8/2014 as per the EVNTTRACE DATE.
Please Advice.
Cheers
Prasad CH.