Hi Crag ,
Thanks for understand because i am totally new in QM.
I won't use QM for Notification here. I will use QM for stock transfer & QM in Delivery before PGI.
As i know the basic requirement of QM
Setup the Master Data (QM View & all QM relavant data) ---> Type of inspection (which will determine which type of inspection to carry out ) -----> Inspection Lot Configuration --->Configuration for UD ----> Configuration for COA.
Master data that which required
- Material master QM view,
- Master inspection characteristics,
- Task lists or inspection plans
- Code, Code groups and Selected sets.
- Quality info-record
My Question :
- By having the above setup and configuration , without result recording can i have the COA to print out for either Post Process Inspection (Final FG) or Inspection at Delivery ?
- With the Master Data which i mention as above , is it sufficient for me to activate
- Post Process Inspection (Final FG - QM PP)
- QM Inspection at Delivery (QM /SD)
- QM stock transfer with inspection type 08.
Hope to hear from you.
Thank you