BOM not exploding using CS11

$
0
0


Hi All,

 

We are working in a Tobacco industry, in discrete manufacturing. Recently, we have introduced the concept of planning and factory plant due to the specific requirements from the current end markets.

The logic, there will be two plants assigned to different Company Codes: -

 

1. Principal plant (planning plant) - All the ROH, SFG & FG stocks are only maintained at this plant. No manufacturing is done at this plant. No Master data maintained at this plant only the SKU's are extended. Material movements are done using special procurement keys

 

FG/ SFG -  SPK of production at alt plant.

 

2. Factory Plant - All the productions take place at this plant but no stocks are help at this plant. All Master data, BOM Routing, PV, Product Cost Collector etc are defines at the factory plant.

 

ROH/ SFG  - SPK of Withdrawal from Alt Plant.

 

With the above set-up of the material master for the ROH, SFG & FG, the transaction CS11 is not exploding all the levels of the BOM. I have observed that removing the special procurement keys, these work perfectly fine.

 

If some of you have faced similar issues earlier, please let me know what can be a possible work around.